Family-run painting crew · Mill Creek, WA Free on-site estimate
Text or call Olga, 7:00 AM – 9:00 PM, 7 days (425) 543-8307
Text Olga Call (425) 543-8307

Olga usually replies within minutes, 7:00 AM – 9:00 PM, 7 days. Crew works Mon–Sat, 8:00 AM – 7:00 PM.

Our work

14 jobs, photographed while we were on them.

This is what we have photographed so far, not everything we have built. We started keeping a proper record recently, so the page is short and it is real — it grows by a job or two a month. If you want to see something that is not here, text and ask.

  • Photographed on the job as we went, not staged afterwards
  • No stock photography and no generated images anywhere on this page
  • Where we have the before shot you get the pair — where we do not, we say so

Deck & balcony rebuild

A second-storey balcony taken back to the frame and rebuilt in cedar

The old balcony was stripped down to the structure — the first photo is the house with the railing gone and the beams exposed. New framing went up, then cedar decking and a full cedar railing, cut and fitted on site.

Second-storey balcony stripped back, railing removed and support beams exposed Before
The finished cedar balcony deck and railing, looking along the boards After
Two of the crew setting the new balcony frame, ladder against the wallCedar balcony railing being fitted along the length of the house
The same job while it was open.

Patio door replacement

An old sliding patio door taken out and a new one set in the same opening

The old slider came out frame and all, leaving the bare rough opening. The new door went in, and the outside was finished with fresh cedar trim around the frame. The first and last photos are taken from the same spot in the room.

The old sliding patio door from inside, one panel out of its track Before
The new sliding patio door from the same spot inside, deck and fence beyond the glass After
The old door being pulled from its frame, seen from the deckThe empty rough opening in the wall with the door removedThe new patio door from the deck, framed in fresh cedar trim
The same job while it was open.

New deck build

A new cedar deck with a wrapped step down to the yard

Built new below an existing upper deck. Angled corners, boards laid tight, and a wide wrapped step that runs the length of the front edge instead of a narrow stair.

New cedar deck seen from the yard, upper deck and stairs behind itDeck boards and railing from the far corner, trees behindThe deck along the wall of the house, boards running away from the cameraThe wrapped step and stair treads joining the two deck levels

Interior painting

Rooms repainted with the floors sheeted and the trim cut in by hand

Walls and ceilings through a set of rooms. The floor goes under plastic before anything is opened, and the corner shot shows a wall halfway between the old colour and the new one — that hard line is cut in with a brush, not taped.

A painter rolling the top of a wall, seen from behindCorner of a room part-painted, the cut line between old and new colour visibleRepainted room with the floor covered in protective sheetingThe same room from the opposite corner, walls and ceiling finishedAnother repainted room, sheeting still down over the floor

Bathroom repair

A shower joint cut out and resealed

Mould had taken hold in the joint where the pan meets the tile. The old sealant was cut out rather than painted over, the surfaces dried, and a new bead run in a single pass.

Close-up of a shower joint with mould along the old sealant line Before
The same joint after the old sealant was removed and a new bead applied After

Fence & gate

A cedar gate built and hung to replace one that had given up

New boards, new posts and proper hinges, hung against the older fence it joins — you can see the colour difference where the new cedar meets the weathered run.

A newly built cedar gate hung between posts beside an older weathered fence

Installation

A kitchen fitted: cabinets, worktop, splashback and sink

Base and wall cabinets set and levelled, bamboo worktop cut to the run, tiled splashback, undermount sink and dishwasher in place.

Fitted kitchen cabinets with a bamboo worktop, tiled splashback and undermount sink

Deck railing

A new wood railing built around an upper-level deck

The old railing was taken off down to the corner posts. New rails and balusters were cut and fitted around the full run of the deck.

The deck with the old railing removed, only the corner posts standingThe new railing in place, offcuts and tools still on the deck boardsThe finished railing around the deck, evergreens behindThe upper deck and its new railing seen from the patio below

Framing & drywall

A closet built into a bedroom wall, from framing to doors

Studs framed out from the old wall, drywall hung and finished, the alcove painted, then bi-fold louvered doors hung across the front. The floor stayed under plastic the whole way through.

New wood framing for a closet standing in front of a blue bedroom wallThe closet framing covered in drywall, floor under plastic sheetingThe finished closet alcove painted white, step ladder insideLouvered bi-fold doors hung on the new closet, standing openThe finished closet with its louvered doors closed

Porch & steps

A front porch landing and steps rebuilt

The old landing sat on concrete blocks with metal edging on the treads. It was taken out, and a new landing, steps and railing were built in its place against the front of the house.

The old front porch on concrete blocks, with a wooden railing and metal-edged steps Before
The rebuilt front steps and landing with a new wooden railing After
The porch area cleared by the front door, new lumber laid out on the lawn
The same job while it was open.

Bathtub refinishing

A bathtub refinished in place

Everything around the tub is taped off before the coating goes on — the first photo is mid-job. The tub stays where it is; no demolition, no new plumbing.

A bathtub taped off around the edges while being refinishedThe refinished tub, white and glossy, tiled wall above

TV mounting

A large TV hung on a slatted feature wall

The bracket goes on first, then the TV and the soundbar under it. The last photo is a different job — a TV mounted above a fireplace.

A TV wall bracket fixed to a slatted wood wall, drill on the floor Before
The TV hung on the bracket with a soundbar below and a media console After
A TV mounted on the wall above a tiled gas fireplace
The same job while it was open.

New fence

A new cedar privacy fence along a narrow side yard

Full-height cedar boards with a cap rail, running the length of a narrow side yard beside the house.

A new cedar privacy fence along a side yard, soil freshly rakedThe same fence from the other end, running past the house

Furniture assembly

Flat-pack furniture and closet systems put together and set in place

Cabinets, dressers, a bunk bed and closet shelving systems — unboxed, assembled and set in place.

A closet shelving system with drawers installed in a reach-in closetAn assembled white bunk bed in a carpeted bedroomA tall white storage cabinet assembled and standing in a kitchenAn assembled wide dresser with woven drawer frontsCloset shelves and a hanging rail fitted in an empty closetA white corner cabinet assembled beside a refrigerator

How to judge any contractor's photos

Every after photo looks good. Here is where to actually look.

Fresh paint and new cedar hide everything for about a year. The four things below separate work that still looks right in year three from work that does not — check them in our photos, and in everyone else's.

Where trim meets siding

A clean brush line with no ridge of old paint underneath means somebody scraped before they painted.

The caulk joints

Gaps around windows and corner boards should be filled and smooth — painted-over cracks reopen in one wet winter.

Under the eaves and behind the downpipes

The awkward places get skipped when a crew is rushing. If they are in the photo, that is on purpose.

The ground around the house

No overspray on the concrete, plants uncovered and alive, floors sheeted before anything is opened.

Text the desk

Text Olga — just send her the address

Free walkthrough, written price, three-year warranty, no deposit to book. Twenty-one cities from Everett to Renton.

Olga usually replies within minutes, 7:00 AM – 9:00 PM, 7 days · crew works Mon–Sat, 8:00 AM – 7:00 PM

Olga will text you back — she usually replies within minutes, 7 AM – 9 PM. We use your number for this job only.